Description
Female DC Connector 5.5mm X 2.1mm With 5 Ft Long Lead Wires For LED Strip Power Supplies And Remote
DEVELOPMENT SITE – Nutech – DEVELOPMENT SITE
$2.77
Female DC Connector 5.5mm X 2.1mm With 5 Ft Long Lead Wires For LED Strip Power Supplies And Remote
Female DC Connector 5.5mm X 2.1mm With 5 Ft Long Lead Wires For LED Strip Power Supplies And Remote
| Weight | 0.083 lbs |
|---|---|
| Dimensions | 7.5 × 3 × 0.5 in |
You must be logged in to post a review.
Reviews
There are no reviews yet.